4te Wireless Load Pins for Hydroelectric Power Plant 📰
29th Nov 2024These 4 tonne rated wireless load pins have been manufactured for use in an underground hydroelectric power plant in Canada. The power plant is 1300ft inside a mountain, so the load pins were designed to operate in temperatures as low -40 degrees centigrade, as well as being suitable for use in a humid and moist environment. The load pins will be installed in overhead cranes to monitor the loads on the hoists and have been supplied with handheld displays for real time viewing of load data.